Brittny Die Tetner Frame

Project Details

Maco Electric, LLC was contracted by Teknikor contracting to design, install and commission a machine wiring system for a local textile manufacturer.The customer had dealt with an OEM to purchase the line and control system, however they needed assistance with custom integration into their facility. Maco worked directly with Brittany global in-house staff to lay out a proper design for how the line would operate, as well as designing control wiring from several other auxiliary pieces of custom equipment. Maco also provided a full turn key wiring package, everything from site lighting, machine power feed and control wiring. This project was completed over the course of 4 months, initially production was scheduled for May 20th of 2023. Maco needed about 5 months to complete the project, but due to delays in OEM delivery, it cut the time down to 4 months. Brittny global made their first run on May 18th of 2023.

Collaborators

Z

General Contractor

Teknikor Contracting